Welcome To Ksquared Builders

Wednesday, November 26, 2014

Top 5 Thanks’ Given after Maw’s Kitchen Remodeling

Top 5 Thanks’ Given after Maw’s Kitchen Remodeling
Dear Contractor, Thank you for Remodeling Maw’s’ kitchen and…
1. … adding a “con-vection” microwave in addition to her stove. Now she can cook and we can feast on turkey AND ham… all in the same sittin’!
2. …building that spacious center island which gives Maw space to whip up her special fixins’ like: “Creamy Coon Pasta w/ Tadpole Puddin’ ” and “Artery Cloggin’ Hog Mash w/ Taters.”
3. …hiding all, well most all, of her stinky garbage in them crafty pull out trash bins.
4. …protecting her precious god-fearing fingers from sure dismemberment by eliminating those dark and dangerous shadows with them newfangled L E D under-cabinet light thingy’s.
5. …saving Maw and Paw’s marriage by creating two prep areas which allow them to work in the same kitchen without even once throwing hot grease on one tuther’.
Happy Thanksgiving to you and yours from the K Squared Team!







Every Work with "That Guy"?

Ever work with "that guy"? 
TIP OF THE DAY: Ask your remodeler "When something goes wrong, how do you handle it?" How they answer might be a "tell" of how the job would go.

A "picture" perfect Dining Room.


"Ed and I wish to thank you so much for the wonderful work that K Squared Builders, and specifically your son, Lance, and his assistant Scott recently completed for us. Our new dining room is absolutely beautiful, and I very much look forward to having all our children and grandchildren over for Thanksgiving dinner to officially "christen" the room. Also, it is so nice to have our laundry room upstairs on the main level so I no longer have to haul clothes up and down the stairs." Ed and Janet Kilpatrick

Sunday, November 16, 2014

"'Job Well Done"

"My husband and I want to thank you, Lance, and the crews for a wonderful job, well done. The list is long and I hope I haven't left something out:

-trim work in hall, kitchen, powder room and family room
-a hand rail to the second floor
-removal of wallpaper - the job turned out to be much more difficult than anticipated
-paint - most of the first floor
-renovation of the powder room from top to bottom, including a much-needed shelf in the cabinet
-helping me select a neat and different sliding patio door
-grab bars in 2 bathrooms

Not only are we pleased with the work, we can't say enough good things about how you and all the workers were on time for scheduled work and how it was done neatly, and well-cleaned up afterward.
Also, the workers were respectful of our privacy as best as possible.

Thanks to all. Can't wait to plan next project!"

Kay and Joe B.